KUALA LUMPUR, Nov 18 (Bernama) -- Responsibility for tackling flash floods in the country should not rest solely with the Department of Irrigation and Drainage (DID), but requires concerted efforts by all parties, particularly local authorities (PBTs), in ensuring proper maintenance of drainage systems.
Deputy Energy Transition and Water Transformation Minister Datuk Seri Abdul Rahman Mohamad said weaknesses in the management and maintenance of drainage systems by local authorities had been identified as among the main factors contributing to flash floods, even when river levels did not overflow during the monsoon season.
He said drains that were not thoroughly cleaned could obstruct water flow, affecting the drainage system’s capacity to handle increased water runoff during heavy rainfall.
“This means all parties need to work together in a coordinated manner to prevent such occurrences, and we must do our best to ensure that these incidents do not happen,” he said.
Abdul Rahman said this when winding up the debate on the Supply (Budget) Bill 2027 and the 2027 Development Expenditure Estimates Motion at the committee stage for the Ministry of Energy Transition and Water Transformation (PETRA) in the Dewan Rakyat today.
On long-term solutions at the national level, he said that 151 Flood Mitigation Plan (RTB) projects had been approved under the Second Rolling Plan (RP2) of the 13th Malaysia Plan (13MP), with an estimated total cost of RM28.1 billion.
He also said that the government had allocated RM2.52 billion for the implementation of the National Non-Revenue Water (NRW) initiative, aimed at reducing the country’s NRW rate to 31.7 per cent next year.
Of the total allocation, RM418.95 million had been set aside specifically for the reimbursement programme for eligible water operators nationwide.
He added that the allocation focused on replacing critical pipelines and implementing holistic solutions, including the establishment of District Metering Areas (DMAs), pressure management and active leak detection.
“The government is continuing the National NRW initiative from 2025 to 2030, focusing on replacing critical pipelines and implementing holistic solutions, including the establishment of DMAs, pressure management and active leak detection,” he said.
The Dewan Rakyat subsequently passed PETRA’s RM5,329,612,900 allocation for operating and development expenditure under Budget 2027 by a majority voice vote, following a debate by 32 Members of Parliament.
-- BERNAMA
BERNAMA provides up-to-date authentic and comprehensive news and information which are disseminated via BERNAMA Wires; www.bernama.com; BERNAMA TV on Astro 502, unifi TV 631 and MYTV 121 channels and BERNAMA Radio on FM93.9 (Klang Valley), FM107.5 (Johor Bahru), FM107.9 (Kota Kinabalu) and FM100.9 (Kuching) frequencies.
Follow us on social media :
Facebook : @bernamaofficial, @bernamatv, @bernamaradio
Twitter : @bernama.com, @BernamaTV, @bernamaradio
Instagram : @bernamaofficial, @bernamatvofficial, @bernamaradioofficial
TikTok : @bernamaofficial