COVID–19 NEWS   Owners of premises in buildings allowed to determine protocol on wearing of face mask at their venue - Johor Exco | Italy greenlights Omicron-adapted COVID-19 booster shots | New COVID-19 cases down 16.9 pct last week | Japan to simplify COVID-19 airport quarantine procedures | EMA endorses Omicron-adapted COVID-19 vaccines | 
BUSINESS

Construction of new airport in Lawas to start Q1 2023, expected completion end-2026 -- Awang Tengah

12/08/2022 08:54 PM

KUCHING, Aug 12 (Bernama) -- The construction work for the proposed new airport in Lawas, located 1,039 kilometres from here, is expected to start by the first quarter (Q1) of next year while its completion is expected to be by the end of 2026. 

Sarawak Deputy Premier Datuk Amar Awang Tengah Ali Hasan said the new airport would be a game changer that could spur the economic activities in Sarawak’s northernmost district.

He said the project came at a time when there would be mega projects such as the Northern Coastal Highway (NCH), Sarawak Sabah Link Road (SSLR) and Trans Borneo Highway (LTB) to come up in the area.

“As such, this new airport is vital as it will serve as the catalyst for economic growth in the northern region,” he said in a statement issued by Sarawak’s Regional Corridor Development (RECODA) in conjunction with the official closing of the new Lawas Airport Assessment Lab session today.

Awang Tengah, who is also the Northern Region Development Authority (NRDA) chairman, said Lawas needed a bigger airport to accommodate the influx of both business and leisure tourists to the town to participate in its economic and tourism activities.

He said the Sarawak Ministry of Industrial Trade and Investment is in the midst of completing the masterplan study for the development of an industrial terminal which would become a part of Lawas petrochemical hub.

Besides that, he said RECODA had completed a study on a proposed new deep-sea port in Lawas and both these studies aimed to identify the success factors and ecosystem to support the proposed development of the petrochemical industry in the region.

The two-day value assessment lab was attended by consultants and officers from various relevant government agencies to gather inputs for the new Lawas airport project to achieve better value and optimal cost.

Lawas is currently served by the existing short take-off and landing (STOL) airport, which has been in operation since 1961 and, despite being upgraded in 1996, continued to experience floodings issues as well as an increase in passengers and cargo.

The Transport Ministry, in its feasibility study report in 2016, had recommended a new airport with a runway length of 1,500 meters which can accommodate ATR 72-500 aircraft to be developed.

-- BERNAMA

 

 

 

 

 


Bernama is the trusted source of reliable real-time comprehensive and accurate news for both the public and media practitioners. Our news is published at www.bernama.com ; BERNAMA TV on: Astro Channel 502, unifi TV Channel 631, MYTV Channel 121 IFLIX; and Bernama Radio broadcasting locally on FM93.9 in Klang Valley, Johor (FM107.5), Kota Kinabalu (FM107.9) and Kuching (FM100.9).

Follow us on social media :
Facebook : @bernamaofficial, @bernamatv, @bernamaradio
Twitter : @bernama.com, @BernamaTV, @bernamaradio
Instagram : @bernamaofficial, @bernamatvofficial, @bernamaradioofficial
TikTok : @bernamaofficial

© 2022 BERNAMA   • Disclaimer   • Privacy Policy   • Security Policy